Kansas Department Of Transportation
Home MenuK-96 Improvements Open House #2
The K-96 Improvements Project Team is excited to present Preferred Design Alternatives and draft Environmental Assessment findings for the corridor:
- Upgrading the freeway between I-135 and I-35 interchanges
- Expanding the highway from 4 to 6 lanes
- Improving seven interchanges: Hillside, Oliver, Woodlawn, Rock, Webb, Greenwich, and 21st
The project will enhance safety, improve capacity, provide reliable travel times and relieve congestion to keep Kansans moving.
Design Alternatives & Environmental Impacts
On February 2, 2023, the K-96 Improvements Project team shared Preliminary Design Alternatives with the public at the first Community Open House. After incorporating feedback received at that event, along with numerous meetings with stakeholders and members of the community over the past year, the team has prepared Preferred Design Alternatives for the K-96 corridor.
Along with design efforts, an Environmental Assessment was conducted in accordance with the National Environmental Policy Act (NEPA), to document potential project impacts on the human and natural environment.
This Environmental Assessment includes:
- Review of existing and future land uses along the corridor
- Identification of potential historical and archaeological sites
- Survey of wetland and habitats along the creeks crossing the study area
- Modeling to determine potential traffic noise impacts
- Other social and natural environment analyses as necessary and appropriate
The findings of these studies are included in the project’s Draft Environmental Assessment.
As part of the NEPA process, a Public Hearing (Open House #2) was held on April 11, 2024, to share information about the Preferred Design Alternatives and Draft Environmental Assessment and to receive public feedback. This feedback is considered when making decisions on how to best plan, design, and construct the project.
All of the materials shown at the Public Hearing are available for review on this page.
Project Materials
Documents
127th to I-35 Corridor Map
Diverging Diamond Interchange - Rock Road Example
Greenwich to 13th Corridor Map
I-135 to Hillside Corridor Map
Oliver to Rock Corridor Map
Webb Road Interchange
Webb to Greenwich Corridor Map
21st - Preferred Design Alternative
Draft Environmental Assessment
Environmental Assessment Display Boards
Greenwich - Preferred Design Alternative
Hillside - Preferred Design Alternative
Impacts to Section 4(f) Properties
Oliver - Preferred Design Alternative
Proposed Noise Walls
Rock - Preferred Design Alternative
Webb - Preferred Design Alternative
Woodlawn - Preferred Design Alternative
Videos