Project: U.S. 69 over I-35
Overview
Bridge repairs on U.S. 69 over I-35 including bridge deck replacement, bridge rehabilitation, and approach pavement reconstruction. The project is expected to be completed by December.
Traffic control
The ramp from southbound I-35 to southbound U.S. 69 will be closed for the duration of the project. The detour is southbound I-35 to eastbound I-435, then U.S. 69. Motorists expecting to travel to points along U.S. 69 south of 87th Street will need to follow the detour. Motorists should plan ahead and allow for extra time.
There will also be intermittent road closures on I-35 in both directions in the vicinity of the bridge due to overhead work.
Press release (9/5/2019)
Press release (7/25/2019)
Social media
Twitter (8/15/2019)
Facebook (8/15/2019)
Twitter (8/14/2019)